Issue - decisions

TSAR Junction Alterations – Osbaldwick Link Road/Hull Road

22/06/2020 - TSAR Traffic Signal Refurbishment - Hull Road/Osbaldwick Link Road

Resolved: That Option 1, the proposed crossing refurbishment as shown in the drawing at Annex B of the report, be approved.

 

Reason:    This option achieves the core aim of replacing the life-expired traffic signal asset such that it can continue to be operated and repaired economically. 

 


 

Feedback
Back to the top of the page