Issue - decisions
Jockey Lane Cycle and Pedestrian Improvements
10/09/2015 - Jockey Lane Cycle and Pedestrian Improvements
The Executive Member considered a report which set out a revised scheme proposal in response to various issues that had arisen since the previous scheme was approved.
Resolved: That Option ii be approved i.e. the scheme as proposed in Annex C of the report be implemented, with the exception of the proposed Toucan crossing facility which should be made a Parallel Crossing facility as soon as national regulations make this possible, and a Zebra in the meantime (as per Annex D of the report). In addition, the savings achieved from changing the form of crossing facility be used to enable a full carriageway resurfacing scheme between the New Lane and Kathryn Avenue junctions.
Reason: There would be significant advantages in implementing the scheme with the amended crossing proposals shown in Annex D. This should bring down the overall cost of the scheme to around £115k and the savings would release money to allow a full resurfacing scheme to be carried out in conjunction with the proposed maintenance allocation.