Issue - decisions
Water End/Clifton Green Junction: Options for Reinstating a Separate Left Turn Traffic Lane on the Water End Approach
27/09/2011 - Water End/Clifton Green Junction: Options for Reinstating a Separate Left Turn Traffic Lane on the Water End Approach
RESOLVED: (i) That the contents of the report be noted.
(ii) That consultation take place with local
residents and interest groups regarding Option 1 (retaining both the cycle track build-out and the splitter island) and Option 5 (introducing a central cycle feeder lane between two traffic lanes whilst retaining the splitter island).
(iii) That, as part of the consultation in respect of Option 1, views be sought as to whether the cobbles should be removed to provide extra carriageway width.
(iv) That an area-wide review of signal timings for weekdays and weekends be undertaken. (Measure A - as detailed in paragraph 60 of the report)
REASON: To balance various advantages and disadvantages linked to the options, with a view to achieving the best overall solution.