Issue - meetings
Jockey Lane Cycle and Pedestrian Improvements
Meeting: 10/09/2015 - Decision Session - Executive Member for Transport - Expired (Item 17)
17 Jockey Lane Cycle and Pedestrian Improvements PDF 186 KB
This report sets out a revised scheme proposal for Jockey Lane cycle and pedestrian improvements in response to various issues that have arisen since the previous scheme was approved.
Additional documents:
- Jockey Lane Annex A, item 17 PDF 4 MB
- Jockey Lane Annex B, item 17 PDF 763 KB
- Jockey Lane Annex C, item 17 PDF 1 MB
- Jockey Lane Annex D, item 17 PDF 460 KB
Decision:
The Executive Member considered a report which set out a revised scheme proposal in response to various issues that had arisen since the previous scheme was approved.
Resolved: That Option ii be approved i.e. the scheme as proposed in Annex C of the report be implemented, with the exception of the proposed Toucan crossing facility which should be made a Parallel Crossing facility as soon as national regulations make this possible, and a Zebra in the meantime (as per Annex D of the report). In addition, the savings achieved from changing the form of crossing facility be used to enable a full carriageway resurfacing scheme between the New Lane and Kathryn Avenue junctions.
Reason: There would be significant advantages in implementing the scheme with the amended crossing proposals shown in Annex D. This should bring down the overall cost of the scheme to around £115k and the savings would release money to allow a full resurfacing scheme to be carried out in conjunction with the proposed maintenance allocation.
Minutes:
The Executive Member considered a report which set out a revised scheme proposal in response to various issues that had arisen since the previous scheme was approved.
Officers stated that there had been a change in terminology used and that references in the report to “tiger crossings” should be replaced with “parallel crossings”.
The Executive Member considered the following options:
· Option i: Implement the scheme as proposed in Annex C (with a Toucan crossing)
· Option ii: Implement the scheme with a Zebra Crossing point as shown in Annex D now and replace it with a Parallel Crossing when it is legal to do so.
· Option iii: Postpone the project until the legislation is in place to introduce a Parallel Crossing on Jockey Lane without doing the Interim Phase Annex D.
· Option iv: Do nothing.
Resolved: That Option ii be approved i.e. the scheme as proposed in Annex C of the report be implemented, with the exception of the proposed Toucan crossing facility which should be made a Parallel Crossing facility as soon as national regulations make this possible, and a Zebra in the meantime (as per Annex D of the report). In addition, the savings achieved from changing the form of crossing facility be used to enable a full carriageway resurfacing scheme between the New Lane and Kathryn Avenue junctions.
Reason: There would be significant advantages in implementing the scheme with the amended crossing proposals shown in Annex D. This should bring down the overall cost of the scheme to around £115k and the savings would release money to allow a full resurfacing scheme to be carried out in conjunction with the proposed maintenance allocation.