Decision details

To publish an errata addendum to the revised CIL draft Charging schedule

Decision Maker: Corporate Director of Place

Decision status: Decision Made

Is Key decision?: No

Is subject to call in?: No

Decision:

A decision was taken on 15 December 2023 to consult on a revised Community Infrastructure Levy (CIL) draft Charging Schedule and its supporting viability sensitivity testing evidenced base. However, an error in the evidence based needs to be corrected and consequently, the schedule needs amending to align with the evidence base.
As per the errata addendum, evidence pertaining to retirement/sheltered accommodation in green field locations was incorrect. The errata addendum now evidences that all such accommodation should be nil rated for CIL. The amended CIL charging schedule out to consultation has been updated to reflect this.
Decision: To publish an errata addendum to the revised CIL draft Charging schedule has been agreed.

Options Considered:

• To publish the errata addendum and amended CIL draft Charging schedule for consultation
• To not publish the errata addendum or an update to the CIL draft charging schedule.

Options Rejected:

• To not publish the errata addendum or an update to the CIL draft charging schedule.

Publication date: 21/12/2023

Date of decision: 21/12/2023

Accompanying Documents:

 

Feedback
Back to the top of the page