Issue - decisions
Deviating part of the order route of bridleway York 308 shown in Public Bridleway York 138 and Public Bridleway York 308 Modification Order 2023
26/11/2025 - Deviating part of the order route of bridleway York 308 shown in Public Bridleway York 138 and Public Bridleway York 308 Modification Order 2023
Background / Decision Summary:
In preparation of the Statement of Case submission for the Public
Bridleway York 138 and Public Bridleway York 308 Modification Order
2023 evidence about the alignment of bridleway York 308 has come to
light.
At the time of determining the application in 2023 it appeared that
the deviation of bridleway York 308 over the flood bank as shown on
the enclosed maps had been introduced following flood bank works in
2019/2020. Therefore, it was not considered to be within the
relevant 20-year period of 2000 to 2020. However, on closer
inspection of the mapping and aerial photo evidence it appears that
the deviation of bridleway York 308 over the flood bank had been in
place since at least the 1990s. These findings were supported by
the user interviews.
In the absence of any evidence refuting the existence of public
rights of way, the evidence is sufficient to demonstrate that the
revised order route has been used by the public, on the balance of
probabilities for more than 20 years. Therefore, we are seeking
authorisation from the director to ask the Inspector appointed to
make a final decision about the Order to amend the Order to reflect
the deviation as shown on the enclosed maps.