Decision details
To accept an offer on the custom build land at Burnholme Green.
Decision Maker: Director of Finance
Decision status: Decision Made
Is Key decision?: No
Is subject to call in?: No
Decision:
In March 2022 the council Executive approved
the recommendation to enter into a construction contract with
Caddick Construction to deliver the Burnholme Green scheme in
accordance with the approved planning application 20/01916/OUTM.
This planning approval contained, as noted in the report to the
executive, 5 self-build plots named as Terrace 5. As part of the
construction contract, Caddick Construction were required to level
the site and bring services up to the boundary of the self-build
land.
Following learnings from Lowfield Green, the decision had been made
not to allow any self-builders to start on site until the main
contractor had finished the main site. During construction of the
main development, the council was approached by a custom build
developer with an offer for the land that detailed a proposal to
deliver 7 custom build homes. This offer was within the RICS
valuation for the land with the added benefits of delivering 2
additional dwellings. As well as giving residents of York the new
opportunity to customise and shape their own home, the singular and
coordinated nature of a custom build development on this extremely
constrained site also has advantages for the new residents of the
Burnholme Green.
This solution meets the intended outcome of securing a development
that delivers truly custom-built homes to ensure that the dwellings
can be counted as self or custom build under the Self-build and
Custom Housebuilding Act 2015 (as amended by the Housing and
Planning Act 2016). The councils self-build register currently has
881 individuals registered as wanting to design and build their own
home in York with only 181 self-build planning permissions having
been granted since 2016.
While this delivery model does reduce the choice available to the
self-builders, a survey sent out to those on the self-build
register revealed that there was considerable appetite for this
type of custom build development. With the legislation accepting
that the self and custom build spectrum is broad, it is felt that a
custom-build solution will enhance York’s offer and is better
suited to this site.
This decision proposed is to accept the offer for Terrace 5 at
Burnholme Green from a custom build developer and have contracts
drawn up and proceed to the exchange of contracts, and completion
under the terms of the contract.
Options Considered:
1) To accept the offer for Terrace 5 at
Burnholme Green from a custom build developer and have contracts
drawn up and proceed to the exchange of contracts, and completion
under the terms of the contract.
2) Sell the plots of individually to self-builders to design and
build their own homes on the Burnholme Green development.
Options Rejected:
Option 2 was rejected.
While we know this delivery model works, especially with the
changes made following our Lowfield Green review, it does still
have some challenges including some over and above what was
experienced on Lowfield Green due to specific site constraints as
detailed below.
While at Lowfield Green we had the space to provide a separate set
down area for the self-builders to store materials and to park,
this won’t be the case on Burnholme Green as the self-build
plots are situated opposite a completed terraced street.
Due to the low-car parking nature of the site, none of the
self-build plots would have driveways, which further reduces
on-plot space for parking and storage and with the terrace opposite
being occupied at the point where self-build construction begins,
there is significant potential to cause complexities to ensure the
workers and residents stay safe and in terms of potential
complaints from neighbours living in the newly constructed homes,
with 5 constrained neighbouring sites being built out in
parallel.
The lack of parking and storage will likely increase with multiple
contractors working across the 5 plots. With the compact nature of
this site it would be important to have someone coordinating the
logistics of deliveries, cranes, and waste removal.
Selling the plots to five individual self-builders will be
significantly more resource intensive for the council as the
councils Community and Self-build Officer will need to liaise with
5 individuals rather than having a single point of contact.
Additional legal resource would also be required to prepare and
draft 5 individual sales contracts and transfer documents.
Supporting 5 individuals who have never built a house before
through the planning process as proved to be resource
intensive.
Less homes would be delivered.
Publication date: 24/07/2026
Date of decision: 23/07/2026